Summary
Overview
Work History
Education
Skills
CAREER OBJECTIVE
Timeline
AdministrativeAssistant
Imad Ramdane

Imad Ramdane

SENIOR ELECTRICAL ENGINEER
Skikda

Summary

Results-driven Electrical Engineer with over 10 years of extensive experience across diverse construction sites nationwide, demonstrating versatility and strong commercial acumen. Committed to ensuring seamless coordination among all parties, adhering to established schedules while supervising each phase of work. Proficient in delivering effective solutions that guarantee on-time project completion in alignment with execution plans, industry standards, and contractual obligations. Recognized for a dynamic approach, excellent communication skills, and adaptability to changing schedules, complemented by a strong ability to foster positive relationships and rapidly learn in fast-paced environments.

Overview

14
14
years of professional experience
3
3
Languages

Work History

Electrical Construction Engineer (Red Med 3rd Party)

JV Gas (Sonatrach-ENI-Equinor)
09.2023 - Current
  • Work packs & method statements preparation and execution for electrical and instrumentation related MOC’s (Management of change).
  • Permit to work preparation and control as a certified performing authority.
  • Supervise and monitor all electrical, instrumentation and telecom construction and commissioning activities in accordance with drawings, standards and method statements.
  • Carry out inspections on site and test reports validation (GOC certificate: guidance on certification).
  • Punch list clearing.
  • Distribute manpower and manage E&I team manpower.
  • Material inspection and preparation for the specified job.
  • Prepare and submit daily and weekly report to project manager.
  • Attend daily, weekly and monthly meetings (management and HSE meeting.).
  • Coordinate with other disciplines and departments.
  • Ensure that all activities are in accordance with BP HSE rules.

QA/QC E&I Engineer

LARSON TOBRO HYDROCARBON ENGINEERING (LTHE)
10.2021 - 03.2023
  • Project: SOUTH WEST GAS FIELDS DEVELOPMENT PROJECT GAS TREATMENT UNIT EPC2- PHASE1
  • Follow up the Electrical activities, Earthling, cable tray installation, lighting, cable pulling and termination.
  • Oversee the installation of grounding, lighting and small power inside substations, control buildings and general infrastructure.
  • Supervise the installation and termination of LV electrical cabinets, MCC, Switchgear, GIS, motors, turbine, and compressors
  • Supervise the installation and the connection of UPS panels and battery racks.
  • Supervise the erection, installation and connection of MV transformers, bus duct, NGR, and diesel emergency generator.
  • Supervise the equipment installation and connection of catholic protection system, heat trace system.
  • Insure the quality and performs the inspections.
  • Prepare and submit daily site activity reports and progress (PMS) to construction site manager.
  • Coordinate and Follow-up the delivery of equipment and the availability of the Electrical Materials.
  • Insure and follow up the preservation of the electrical equipment.
  • Check comment and approve subcontractor’s documents such as method statements and material requests.
  • Assist the vendors during pre-commissioning and commissioning.
  • Follow up and Close with the client the punches.
  • Coordinate with the field engineer and perform the Red line markup according to the site modification.
  • Attend the weekly coordination meeting with the all disciplines and plane the daily activities accordingly.
  • Attend the daily meeting and Insure the improvement of the daily ITR progress.
  • Assisting in the hiring, selection and training of junior staff.
  • Follow the safety instructions, the applicable HSE policy.

Electrical Supervisor (Construction / Commissioning)

JGC CORPORATION
12.2018 - 03.2020
  • Project: HMD South Satellite Revamping.
  • Plan, Coordinate and direct the personnel and operational activities.
  • Carry out the monitoring as well as control of performance and quality by referring to the Project planning and KPI (Key Performance Indicators).
  • Follow the Electrical activities, Grounding, lighting, telecom, heat tracing, cable pulling and termination, cable tray.
  • Electrical Materials Follow-up.
  • Establish daily and weekly reports to my direct hierarchy and attend weekly meeting
  • Performs inspections with the client.
  • Performs punch-listing operations.
  • Assist the commissioning of LV switchgears, Motor Control Center (MCC).
  • Assist the test of electrical equipment including continuity, insulation and resistance, HIPOT test.
  • Assist the motors solo run and the function LCS (local control station) test inspections of electrical equipment.
  • Assist the commissioning and startup of electrical equipment, motors low and medium voltage, compressors.
  • Assist with vendors the tests and commissioning including UPS panels, battery charge and discharge tests, EDG (emergency diesel generator)

Electrical Engineer

EVOLUTEC INTERNATIONAL
03.2013 - 07.2018
  • Pilot the technical-commercial offers of tenders.
  • Analyze the specifications and participate in researching technical solutions.
  • Develop planning and organization charts of projects according to the needs of specifications
  • Define the human and material resources needed to execute the contracts projects.
  • Developing, reviewing, updating, modifying, and approving electrical design plans and work schedules
  • Establishing relationships with clients, vendors, suppliers, other professionals, and expanding networks
  • Prepare and present design reviews for internal and external customers
  • Ensure best design practices are followed and drive process improvements.
  • Participate to achieve the construction projects on site.
  • PROJECTS ACHIEVED WITH EVOLUTEC INTERNATIONAL (MOBILIZATION TO SITE)
  • Project: PMA Sinter Plant Arcelor Mittal Annaba Rehabilitation
  • Customer: ABB.
  • Position: Electrical Supervisor.
  • Organize and planning electrical work on site.
  • Supervise the installation and assembly work of MCC, PLC and lighting cabinets.
  • Supervise cable tray installation, pulling power, control and optical fiber cables.
  • Supervise the termination work in MCC, MV switchgear, PLC and lighting cabinets
  • Assisting in the testing of electrical cables including continuity, megger and HIPOT test.
  • Prepare and submit daily site activity reports to construction site manager
  • Respect the quality standards defined by the internal management system.
  • Follow the safety instructions, the applicable HSE policy and the specifications of the contract.
  • Project: East -West highway (TUNNEL T3/T1) (TUNNEL T4).
  • Customer: CEGELEC contracting
  • Position: Electrical Supervisor.
  • Site activities supervision (wiring and connection of lighting cabinets, TGBT, UPS and SCADA Cabinets).
  • Verification of electrical installations in accordance with approved plans.
  • Monitoring of equipment and control of electrical installation work as per planning.
  • Installation of lighting system in Tunnel.
  • Installation of fire detection systeme.
  • Installation of transformer 20KV/400V.
  • Leading team of Electrical technicians.
  • Project: Maintenance Project and Analysis site non-conformities.
  • Customer: METALENG-Spa-NAFTAL / SONATRACH
  • Position: Electrical Engineer
  • Field inspection and verification of non-conformities.
  • Review engineering standard design.
  • Detailed statement of the installation.
  • Functional measures.
  • Establishment of a detailed expert report.
  • Proposal action plans for improvement of facilities.
  • Project: GASSI TOUIL FIELDS GAS PROCESSING FACILITIES.
  • Customer: SONATRACH
  • Position: Electrical Supervisor with JGC CORPORATION
  • Oversees the daily construction activities at site, including scheduling of workers, delivery of equipment and materials, and progress of the project.
  • Determine work procedures, prepares work schedules, and expedites workflow.
  • Manage Electrical Subcontracts activities.
  • Monitor manpower, effectiveness and productivity.
  • Prepare and submit daily site activity reports and progress to construction site manager
  • Electrical Materials Follow-up.
  • Performs punch-listing operations.

Electrical Supervisor

KUM YONG CO LTD subcontractor of SAMSUNG ENGINEERING CO.LTD
09.2011 - 06.2012
  • Project: Rehabilitation and Adaptation of Skikda Refinery.
  • Supervise the cable laying, Glancing and termination of LV, MV electrical cabinets and equipment’s.
  • Insure to achieve the daily activities by respect the project schedule.
  • Coordination with engineering department to update drawings and prepare Field changes and red marks according to site modification.
  • Submit the daily and weekly reports to my direct hierarchy and attend weekly Meeting.
  • Performs punch-listing operations.
  • Ensure adherence to all applicable safety policies and procedures.

Education

Electrical Engineer Diploma -

University ELHAJ LAKHDER BATNA
01.2011

Skills

Comprehensive knowledge of electrical engineering, design and codes

CAREER OBJECTIVE

To obtain a challenging position in a high quality environment where my resourceful experience and academic skills will add value to the organization.

Timeline

Electrical Construction Engineer (Red Med 3rd Party)

JV Gas (Sonatrach-ENI-Equinor)
09.2023 - Current

QA/QC E&I Engineer

LARSON TOBRO HYDROCARBON ENGINEERING (LTHE)
10.2021 - 03.2023

Electrical Supervisor (Construction / Commissioning)

JGC CORPORATION
12.2018 - 03.2020

Electrical Engineer

EVOLUTEC INTERNATIONAL
03.2013 - 07.2018

Electrical Supervisor

KUM YONG CO LTD subcontractor of SAMSUNG ENGINEERING CO.LTD
09.2011 - 06.2012

Electrical Engineer Diploma -

University ELHAJ LAKHDER BATNA
Imad RamdaneSENIOR ELECTRICAL ENGINEER